ItcDataServices.com

Search Results
You searched for "error"

16 FAQs Found
Page 1 of 2
Can terrorism be rejected on Multi Peril policies?
 
What does the Multi-Peril error message: " Bldg #1 - Invalid Group I and Calendar-year Group II deductible combination for Building value mean?
 
I am getting a Page cannot be displayed error message on various web pages, how can I fix this?
 
When rating a Wind Only Commercial-Residential Condo or Apartment, why do I get an error message: "For first loss rating, the building amount of insurance must be less than 80% of the value"?
 
I am trying to rate a Commercial Wind Only Builders Risk quote in TurboRater and I am getting the following error: " Combined coverage exceeds $1,000,000 Maximum Allowed for commercial policy forms". The limit of the building is $2,700,000. Per the manual, it states I may need to manually rate this with the First Loss rules. Is this correct? And what do I need to do to do this??
 
I am having an issue with getting to the TurboStorm login screen or I'm taking a certificate error on the page, what do I do?
 
Why am I getting this error on a Commercial Non-Residential Wind Only risk: "Building #1: Contents insured amount must be less than 80% of contents value"?
 
2009 FIga Assessment Surcharge I thought this was effective 4/01/2010? I did a quote 3/29/2010 effective 4/04/2010 and it applied. I did another quote yesterday effective 4/17/2010 and it wasn't applied. Is this a error in Turbo? Also it was brought to my attention somebody had a quote effective 4/2010 it applied and they went and made a change to the quote and it was no longer on the revised quote. Please let me know what is going on with this charge and when it is effective. Thank you Dawn
 
We have rated a risk with wind mitigation credits and when comparing to the renewal offer by Citizens, your system's Wind Mitigation Credit is $8,354 vs Citizen's $13,295. We have checked each detail of the mitigation and see that you system does not allow an n/a option for FBC Wind Speed or FBC Wind Design nor an option for n/a on the Roof-Wall Connection . These are the only differences in the details yet such a large difference in the credit allowed. Please advise if you have a rating error in your program; if not how can I get my quote corrected?
 
When I type in a description in the Nature of Operation field, I get an error: "Please enter valid description". What can I do?
 
Go to Page :

Can't Find an Answer?
If you cannot find an answer to your question, you can submit it to us and receive an answer by e-mail.

Back to Top